by admin | Jan 30, 2025
Under construction
by admin | Jan 30, 2025
Under construction(supply and Installation 58km Pipes and ancillary, Supply and Installation 4000 PC set of GRP MH cover and frame with ancillaries, Supply, Production& and Installation 4000 PC of precast concrete MH and Asphalt & Gravel Roa Cutting and...
by admin | Jan 28, 2025
Construction of around the building, Secondary line & main line DN 800mm, DN1000mm & DN1200mm concrete precast manhole, supply & installation works of 32.1km OD160mm-OD400mm uPVC sewer pipes, construction of 1.56km access road & construction of 9(nine)...
by admin | Jan 16, 2025
Construction of main line and around the building Waste water Disposal System Koye Feche I site. Supply and laying of UPVC pipe DN 150mm& 22,995 m for 266 blocks; Supply more than uPVC pipe DN 200mm 7,009m; Connection of the sewer system with the building sewerage...
by admin | Jan 16, 2025
Construction of main line and around the building Waste water Disposal System Koye feche II Lot III site. Supply and laying of uPVC pipe from DN 200mm- 400mm = 16,063.17m.; Connection of the sewer system with the building sewerage system for 266 Blocks