Construction of main line and around the building Waste water Disposal System Koye Feche I site. Supply and laying of UPVC pipe DN 150mm& 22,995 m for 266 blocks; Supply more than uPVC pipe DN 200mm 7,009m; Connection of the sewer system with the building sewerage system for 266 Blocks