by admin | Jan 3, 2026 | Uncategorized
The foundation stone placement ceremony for Adama Town Faecal Sludge and Septage Treatment Plant Construction, Operation, and Maintenance Project was successfully conducted. Our company BIGETA Business PLC is the contractor awarded for the construction of the project....
by admin | Dec 17, 2025 | Uncategorized
It is recalled that the contract for the project titled “Construction, Operation, and Maintenance of the Fecal Sludge and Septage Treatment Plant (FSTP) for Adama Town” was signed with Bigeta Business PLC, in joint venture with Qiankun Environmental Protection Joint...
by admin | Nov 15, 2025 | Uncategorized
Source: Ministry of Water and Energy – Ethiopia’s post 14 November at 17:29 ከ 4.6 ቢሊዮን ብር በላይ ወጪ በአዳማ እና በባህርዳር ከተማ የፍሳሽ ማጣሪያና ማስወገጃ ግንባታ ውል ስምምነት ተደረገ፡፡ ጥቅምት 05/2018 ዓ.ም (ው.ኢ.ሚ) የውሃና ኢነርጂ ሚኒስቴር ከ4.6 ቢሊየን ብር በላይ በሆነ ወጪ በአዳማ እና በባህርዳር ከተማ የፍሳሽ ቆሻሻ ማጣሪያና...
by admin | Nov 11, 2025 | Uncategorized
Arba Minch, Ethiopia — October 10, 2025 The Arba Minch Town Faecal Sludge Treatment Plant (FSTP) project received a high-profile visit today, attended by representatives from the World Bank mission team, the Ministry of Water and Energy, and the Regional Water and...
by admin | Nov 4, 2025 | Uncategorized
Addis Ababa, Ethiopia – November 4, 2025 — BIGETA Business PLC has reaffirmed its commitment to quality excellence by conducting an intensive ISO 9001:2015 refresher training for its staff. The two-day workshop took place from October 31 to November 1, 2025, at the...